Hawksmore Church
A selection of completed jobs includes:
  • Annual inspection and stabilisation works to the rock faces of the Avon Gorge at Bristol
  • Geotechnical installation works at the Kilgetty Bypass gorge, including rock meshing and rock anchors to BS8081 (value £140,000)
  • Repairs to the Second Severn Crossing cable anchorages
  • Removal of loose concrete spalls from the façade of Gateshead Multi Storey Car Park
  • Stabilisation of external pre-cast concrete panels to Kirkgate Shopping Centre Car Park in Bradford (value £70,000)
  • Inspecting the Millennium Bridge in London
  • Remedial works to masonry at most historic monuments in South Wales, for which we are term maintenance specialists
  • Slope stabilisation and rock trimming works to the gorge at Bwlch-y-clawdd Mountain, near Bridgend
  • Remedial and stabilisation works to Blaenavon Ironworks in Monmouthshire, now a World Heritage Site, including the installation of Cintec anchors and rock bolts to retain the listed structures (value £170,000)
  • Inspection of deterioration to concrete members of the jetty at Battersea Power Station, with extensive report to client
  • Survey and report, with recommendations on conservation work, to Victorian brick hoppers at Porthgain Harbour in the Pembrokeshire Coast National Park
  • Soil nailing and rock meshing above the beach at New Quay in Ceredigion, West Wales
  • Installation of lightning conductor systems on churches and car parks
  • Design and installation of rope access structural anchor points for new builds, including Terminal 5 at London Heathrow Airport
  • Other works for a selection of Local Authorities